The day included a special ride for contest winners and four ribbon cuttings along the new 11.5-mile line. The Silver Line is opening at the tail end of the pandemic — an odd time for public transit.
The day included a special ride for contest winners and four ribbon cuttings along the new 11.5-mile line. The Silver Line is opening at the tail end of the pandemic — an odd time for public transit.